5-Year Stormwater Renewal

Our simplified in-house process completes your Stormwater Certifications from start to finish.

Since 1995, Holland Engineering has inspected, cleaned, repaired, and redesigned stormwater drainage systems throughout South Florida. Per Broward County Code, a Surface Water Management License Renewal permit must be filed every 5 years.

No matter the type of property, the proper function of a stormwater drainage system is required to have its license renewed with Broward County, and may include obligatory cleaning and/or repairs Services.

Surface Water Management License Renewal requirements and inspection include:
  • Two (2) on-site inspections; an initial inspection, followed by a final second inspection to verify that the cleaning and/or any repairs are completed and compliant
  • A certification letter signed and sealed by a professional Florida-licensed civil engineer
  • Copies of the initial and final property inspection reports, operational activity log, and/or any other documents required for certification.

When you connect with Holland Engineering for your initial inspection, our team of experts will identify all potential site deficiencies. Based on our results, we will send you a proposal/contract for all necessary repairs and cleaning—while always giving you the best possible pricing.

5 Year Stormwater Renewal by Holland Engineering
Experience Matters

Each on-site inspection is performed by an experienced team of state-licensed inspectors and reviewed by our engineering and construction professionals. Our proposals offer the best pricing for a full range of quality drainage and are fully compliant with County/State ordinances.

Detailed pre-service inspections, before-and-after repair photos, and post-service reports ensure our clients receive a complete, high-quality total service package. Our highly transparent pricing structure—the Guaranteed Inspection Fee—provides clients with peace of mind throughout the duration of the certification process.

We place the utmost importance on attention to detail and clarity of information for our clientele. There are no vague, inaccurate or misleading hidden proposal fees, giving clients the peace of mind that they are receiving the best quality services at the best price possible.

Stormwater Renewal by Holland Engineering

Request a Proposal

EMAIL

civil@hollandengineering.us

EMAIL

certs@hollandengineering.us

"*" indicates required fields

SWM, OM, PSO
Max. file size: 50 MB.
CHOOSE FILE
Hidden